Summary Of Results

TOTAL PROJECT COST

$2.8M

TOTAL COST SAVINGS P.A. FOR 7-YEAR GUARANTEE PERIOD

$340,000

ELECTRICITY SAVINGS P.A.

1,450 MWH

KVA PEAK DEMAND REDUCTION

250 KVA

GREENHOUSE GAS EMISSION SAVINGS (CO2-E) P.A.

2,200 TONNES

GAS SAVINGS

2,600 GJ

WATER SAVINGS

1.6ML

MAINTENANCE SAVINGS P.A.

$66,400

Chisholm Institute EPC

Chisholm Institute of TAFE has Guaranteed Efficiency Performance in 65 buildings across 6 campuses

The Chisholm Institute is Victoria’s premier public vocational education and training provider, prominently placed across Melbourne’s south east manufacturing heartland and residential growth corridors. Under the Victorian Government’s Greener Government Buildings (GGB) program, Chisholm issued an Energy Performance Contract (EPC) in 2014 with the goal to reduce operating costs and reduce greenhouse gas emissions. Ecosave was chosen as the preferred tenderer following a competitive Expression of Interest (EOI) and Request for Tender (RFT) process. Ecosave subsequently conducted Detailed Facility Studies (DFSs) across Chisholm’s Institute’s multiple buildings and locations.
The outcome of the DFSs was a performance-based proposal to implement a $2.8 million package of Energy Conservation Measures (ECMs) and Water Conservation Measures (WCMs) at the following campuses: Bass Coast, BerwickCranbourneDandenongFrankston and Mornington Peninsula.

Ecosave was formally awarded the contract by Chisholm Institute in August 2014 and commenced implementation the following month.

The professional services provided included an audit and assessment of various engineering options. Ecosave were able to offer alternatives and pivot on their original proposals when the new technologies became more cost effective between the when the feasibiity study was complete and when the implementation phase had commenced…Ecosave managed the contract works at $2.8 million. They worked across 6 campuses in a diligent and effective manner. They were able to scale up when required, and maintained a tight control over the project timing and costs, and the conduct of their sub-contractors throughout its duration…

– Harin De Soysa – Team Lead, Property Administration – Chisholm Institute

 

Ecosave implemented ECMs and WCMs for Chisholm Institute at over 60 facilities that covered a wide variety of uses and functional spaces including:

  • Offices
  • Libraries
  • General classrooms
  • Computer laboratories
  • Data centres
  • Welding areas
  • Warehouses
  • Carpentry workshops
  • Motor vehicle repair centres
  • Lecture theatres
  • Outdoor spaces
  • Halls
  • Cafetarias
  • Toilets
  • Central plant and control rooms

Technology solutions and services implemented for Chisholm Institute

  • LED Lighting upgrades – replacement of light fittings (e.g. high bay, task lighting, dichroic, linear fluorescent, compact fluorescent) with more efficient LED fittings and luminaires
  • Refurbishment of light fittings
  • Lighting controls including motion sensing controls and daylight controls
  • Solar PV installation
  • Stand-alone appliance time controls
  • BMS installation and upgrades
  • Boiler optimisation
  • Replacement of Air Conditioning Units
  • Economy cycle installation
  • Replacement of Chilled Water systems
  • Recommissioning of HVAC systems
  • Local HVAC controllers
  • Installation and tuning of Variable Speed Drives (VSDs)
  • Compressed Air Optimisation
  • Voltage Reduction Units (VRUs)
  • Toilet cistern modifications
  • Flow control to taps
  • Flow control to showers

 

The works covered in the contract covered Mechanical (conversion from refrigerant system to chilled water), Electrical (replacement of switchboard), environmental (various) and project management, all of which were satisfactorily fulfilled…

– Harin De Soysa – Team Lead, Property Administration – Chisholm Institute

The Energy Performance Contract (EPC) at Chisholm included a 7-year Measurement & Verification monitoring period.

The Measurement & Verification Plan (MVP) for Chisholm Institute was developed in accordance with International Performance Measurement & Verification Protocol (IPMVP) standards and framework. The MVP was submitted with the Detailed Facility Study (DFS) prior to implementation. The final accepted version (83 pages) had been modified after consultation with Department of Treasury and Finance (DTF) to ensure that it met both Chisholm Institute’s and DTF’s reporting criteria.

M&V is presently ongoing as the monitoring period is a total of 7 years (since early 2015). However, M&V results to date have been very promising. So far, Ecosave has exceeded the M&V savings forecast that would ensure the overall guaranteed energy savings are met as per the energy performance contract. For example, the latest M&V results indicates that Ecosave have exceeded the guaranteed savings for Electricity consumption (MWh p.a.) by approximately 18%; similarly for Gas consumption (GJ p.a.) by 70%, Water consumption (64%) and maintenance savings (107%).

Chisholm Institute are saving approximately $340,000 every year on reduced energy costs and maintenance costs; more than 2,000 tonnes of CO2-e of reduced greenhouse gas emissions and over 1.6 mega litres (ML) in water savings every year!