East Gippsland Water EPC

Summary Of ResultsTOTAL PROJECT SAVINGS (P.A.) $178,903CONTRACT VALUE $1.13MPAYBACK PERIOD 7 YEARSELECTRICITY SAVINGS (KWH P.A.) 761,844 KWHENERGY DEMAND REDUCTION (KW) 445 KWDEMAND SAVINGS ($ P.A.) $14,833MAINTENANCE SAVINGS ($ P.A.) $21,081GREENHOUSE…
View Case Study

Chisholm Institute EPC

Summary Of ResultsTOTAL PROJECT COST $2.8MTOTAL COST SAVINGS P.A. FOR 7-YEAR GUARANTEE PERIOD $340,000ELECTRICITY SAVINGS P.A. 1,450 MWHKVA PEAK DEMAND REDUCTION 250 KVAGREENHOUSE GAS EMISSION SAVINGS (CO2-E) P.A. 2,200 TONNESGAS…
View Case Study

Tixana

Summary Of ResultsANNUAL SAVINGS $49,169TOTAL INVESTMENT $178,121TOTAL GAS SAVINGS 3,950 GJRETURN ON INVESTMENT 27.6%PAYBACK PERIOD 3.6 YEARSCO2-E SAVINGS PER YEAR 192 TONNESTixanaIndustrial / Manufacturing Case Study: Ecosave Efficiency – Tixana – Energy…
View Case Study

NSW Department of Education

Summary Of ResultsANNUAL SAVINGS $1,392,942TOTAL INVESTMENT $11,372,610PAY BACK PERIOD 12.2%CO2 SAVINGS PER YEAR 8.2 YEARSCO2-E SAVINGS/YEAR 5,933 TONNESNSW Department of EducationCase Study: Ecosave Energy Performance Contracting, Energy Savings Project – Department of Education &…
View Case Study